Coquihalla Highway 5
Route d’altitude exposée à la neige et à une visibilité changeante.
Risques régionaux : avalanches, fortes chutes de neige et incendies.
Hope · Merritt · Kamloops
Route d’altitude exposée à la neige et à une visibilité changeante.
Risques régionaux : avalanches, fortes chutes de neige et incendies.
Vérifiez les fermetures, l’état des chaussées, le sens de circulation et l’heure du dernier relevé officiel.
Source officielle – Colombie-Britannique ↗Alertes météo régionales; elles ne prouvent pas qu’une autoroute précise est fermée.
© Environment and Climate Change Canada · Alertes météo officielles
Ces événements sont signalés par la source; les autres tronçons ne sont pas nécessairement dégagés.
Mowing from Highway 5, At Avola Overhead Bridge to At Blue River Bridge. Starting Thu Sep 24. From 7:00 AM to 7:00 PM PDT, weekdays. Watch for traffic control. Last update: September 24th, 2026 at 11:02am PDT.
Construction work from Highway 5, At Exit 250 to Larson Hill to At Exit 256 to Coldwater Road. Starting Tue Aug 25. Left lane closed in both directions. Expect delays. Last update: September 5th, 2026 at 6:32pm PDT. 24/7 construction. Please obey signage, slow down and watch for roadside workers. Expect delays.
Utility work from Highway 5A, At Nicola River Rd to At Peterhope Road. Starting Mon Oct 5 until Wed Oct 21. From 7:00 AM to 5:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: September 15th, 2026 at 2:52pm PDT.
Bridge maintenance from Highway 5, At Avola Overhead Bridge to At Avola Bridge. Starting Thu Sep 24. From 6:00 AM to 9:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: September 24th, 2026 at 11:11am PDT.
Bridge construction at Highway 5, At Six Mile Bridge. Starting Thu Sep 24 until Fri Nov 27. Single lane alternating traffic. Watch for traffic control. Width restriction: 3.8m. Weight vehicle restriction: 85T. Last update: October 7th, 2026 at 7:39pm PDT. Lane width reduction to 3.8 m wide lane, with a max 4.4 m width including overhang. In addition, a maximum weight restriction of 85T.
Road construction from Highway 5, At Thunder River Road to At Miledge Creek Bridge. Starting Thu Sep 24 until Sat Nov 7. From 8:00 AM to 5:00 PM PDT, weekdays. Watch for traffic control. Last update: September 24th, 2026 at 10:58am PDT. Single Lane Alternating Traffic will only be required for a brief duration during mobilization and demobilization of materials and equipment.
Slippery sections between Kelly Lake Road (79 miles east of Tumbler Ridge) and Highway 52 N; Highway 29 (Tumbler Ridge). Last update: October 10th, 2026 at 1:52am MST. Next update: October 10th, 2026 at 5:00am MST.
Paving operations from Highway 5, CN Junction Road to In Kamloops. Starting Wed Sep 23 until Fri Oct 23. From 6:00 AM to 7:00 PM PDT, Monday to Saturday. Lane blocked. Expect delays. Watch for traffic control. Last update: September 26th, 2026 at 8:26am PDT. Milling and Paving work.
Water pooling between McLure Ferry Road (15 miles south of Barriere) and Bean Road (near Little Fort). Last update: October 10th, 2026 at 1:51am PDT. Next update: October 10th, 2026 at 5:00am PDT.
Slippery sections between 200 Road (77 miles north of Tumbler Ridge) and the end of Highway 52 N (Heritage Highway) (Tumbler Ridge). Last update: October 10th, 2026 at 1:52am MST. Next update: October 10th, 2026 at 5:00am MST.
© Province de la Colombie-Britannique · Open511 / OGL-BC ↗ · Vérifier sur DriveBC
Les ponts de la route 1 et l’accès Sea to Sky ont des conditions distinctes.
Guide local →KelownaColombie-BritanniqueLa 97 et le col de l’Okanagan changent avec l’altitude.
Guide local →KamloopsColombie-BritanniqueLes routes 1 et 5 se rejoignent près de Kamloops.
Guide local →Sur le trajet Hope · Merritt · Kamloops, les conditions peuvent changer rapidement. Surveillez avalanches, fortes chutes de neige et incendies.
Un rapport indisponible ne signifie pas que la route est libre. Vérifiez les mises à jour officielles et la signalisation.