Québec open road works and winter data
Explore the CC BY 4.0 Québec roadworks and surface datasets with exact sources.
Québec roadworks snapshot from the official open dataset
Latest sample — in effect: 137 · planned: 120 · no readable date: 0.
Official snapshot 265 records returned by the MTMD service (the complete list returned by the service). Checked 2026-11-29 04:50 UTC. Start and end dates are shown as published; “planned” means the source start date is still ahead.
Roads with the most records in this sample
| Road | Records in this sample | Of which planned (start later) |
|---|---|---|
| Road not stated | 57 | 19 |
| 20 | 25 | 20 |
| 132 | 14 | 3 |
| 15 | 12 | 6 |
| 55 | 12 | 11 |
| 40 | 8 | 3 |
| 116 | 7 | 4 |
| 117 | 6 | 3 |
| 138 | 6 | 3 |
| 520 | 6 | 1 |
| 25 | 5 | 0 |
| 50 | 5 | 3 |
In effect now (by source dates) (137)
| Road · type | Location | Period (source) | Description |
|---|---|---|---|
| 25Majeure (semaine et fin de semaine) | Entre Longueuil et Montréal, le tunnel Louis-Hippolyte-La FontaineDirection: Sud et nord | 2025-05-05 05:00 → 2026-12-31 23:59 | Refurbishment of structures Between Longueuil and Montreal, the Louis-Hippolyte-La Fontaine Tunnel In both directions NORTHBOUND tunnel closed, contraflow traffic in the SOUTHBOUND tunnel, at all times Clearance height: 4.3 meters |
| 25Mineure (semaine et fin de semaine) | À Montréal, l'accès de la rue Tellier vers A-25 SUDDirection: Sud et nord | 2026-08-14 22:30 → 2026-12-31 06:00 | Major renovation, Louis-Hippolyte-La Fontaine Tunnel In Montreal, the Tellier Street access to Highway 25 SOUTH SOUTHBOUND Access closed Detour via Des Futailles, Notre-Dame, Dickson Streets, Souligny Avenue East |
| —Mineure (semaine et fin de semaine) | Entre Sainte-Flavie et Mont-Joli, chemin Perreault, à l'OUEST de la rue IndustrielleDirection: Ouest et est | 2024-10-15 00:00 → 2027-05-28 23:59 | Road resurfacing Between Sainte-Flavie and Mont-Joli, chemin Perreault, WEST of rue Industrielle In both directions - Alternating traffic at all times |
| 343Mineure (semaine et fin de semaine) | À Saint-Paul, rue du Curé-Dupont, à la hauteur du chemin Saint-JeanDirection: Sud et nord | 2023-12-19 16:00 → 2027-12-31 23:59 | Structural maintenance In Saint-Paul, on Curé-Dupont Street, at Saint-Jean Road In both directions Shoulders closed at all times Lane width reduced to 3.2 meters |
| —Mineure (semaine et fin de semaine) | À Saint-Ambroise, 8e Rang, sur le pont de la rivière des AulnaiesDirection: Ouest et est | 2026-08-03 00:00 → 2026-12-11 23:59 | Construction of a bridge In Saint-Ambroise, 8e Rang, on the bridge over the Rivière des Aulnaies In both directions Traffic on a diverted road at all times Lane width reduced to 3 meters |
| 239Majeure (semaine et fin de semaine) | À Saint-Aimé, chemin du Pont, pont de la rivière YamaskaDirection: Sud et nord | 2026-11-23 05:00 → 2026-12-18 11:59 | Repair of guardrails At Saint-Aimé, Chemin du Pont, Yamaska River bridge In both directions Alternating traffic on a narrowed lane at all times Lane width narrowed to 4.6 meters |
| 132Majeure (semaine) | Entre la route de la Passerelle à Port-Daniel-Gascons et la route Allain à ChandlerDirection: Ouest et est | 2025-08-20 06:00 → 2026-12-31 18:00 | Public services Between route de la Passerelle in Port-Daniel-Gascons and route Allain in Chandler In both directions Alternating traffic, from Monday to Thursday between 6 am and 6:30 pm Lane width reduced to 3.5 meters |
| 15Majeure (semaine et fin de semaine) | À Saint-Bernard-de-Lacolle Le point d'entrée de Saint-Bernard-de-LacolleDirection: Nord | 2025-02-17 06:00 → 2029-12-31 23:58 | Restrictions at the Saint-Bernard-de-Lacolle border crossing in the northbound direction In Saint-Bernard-de-Lacolle The entry point of Saint-Bernard-de-Lacolle Northbound No lane closures Restrictions for non-standard vehicles in size having: more than 5 m high more than 2.6 m w |
| 15Majeure (semaine et fin de semaine) | À Saint-Bernard-de-Lacolle Au poste frontalier de Saint-Bernard-de-LacolleDirection: Nord | 2025-09-29 00:00 → 2027-12-01 23:59 | Redevelopment of the primary inspection line at the border post In Saint-Bernard-de-Lacolle At the Saint-Bernard-de-Lacolle border crossing Northbound Reduction of the number of lanes from 8 to 3 towards Canada |
| 132Majeure (semaine et fin de semaine) | À Sorel-Tracy, route Marie-Victorin, sur le pont TurcotteDirection: Ouest et est | 2026-11-07 22:00 → 2026-12-04 22:00 | Structural repair In Sorel-Tracy, Marie-Victorin Road, on the Turcotte Bridge In both directions Alternating traffic at all times |
| 440Majeure (semaine et fin de semaine) | À Québec, entre l'A-440 Dufferin-Montmorency et le pont de l'Île-d'OrléansDirection: Est | 2025-01-07 06:00 → 2026-12-31 23:59 | Bridge replacement In Québec, between A-440 Dufferin-Montmorency, and pont de l'Île-d'Orléans EASTBOUND Closure of 1 lane out of 3 at all times |
| 132Majeure (semaine et fin de semaine) | À Salaberry-de-Valleyfield Boulevard Hébert Entre la rue Léger et la rue MassonDirection: Ouest et est | 2026-06-21 00:01 → 2026-12-31 23:59 | Refurbishment of structures In Salaberry-de-Valleyfield, Hébert Boulevard, between Léger and Masson Streets In both directions Complete closure, at all times Detour via rue Masson et rue léger |
Show 48 more
| Road · type | Location | Period (source) | Description |
|---|---|---|---|
| 311Mineure (semaine et fin de semaine) | À Mont-Saint-Michel, sur le pont de la rivière du LièvreDirection: Sud et nord | 2025-03-12 13:00 → 2026-12-31 23:59 | In Mont-Saint-Michel, on the bridge of Rivière du Lièvre Alternating traffic, at all times Detour heavy vehicles, 28 tonnes and over: Des Pionniers Road, Gouin Road, 12th Street, R-309 |
| —Majeure (semaine et fin de semaine) | Entre Sainte-Ursule et Saint-Justin, route Gérin, sur le pont de la rivière MaskinongéDirection: Ouest et est | 2026-04-07 00:01 → 2026-12-04 23:59 | Bridge repair Between Sainte-Ursule and Saint-Justin, on the Gérin road, on the Maskinongé river bridge In both directions Alternating traffic at all times Lane width reduced to 3.4 meters |
| 20Majeure (fin de semaine) | À Longueuil, vers A-25 NORD, tunnelDirection: Est | 2026-11-27 22:30 → 2026-11-30 05:00 | Major renovation, Louis-Hippolyte-La Fontaine tunnel In Longueuil, towards A-25 NORTH, tunnel EASTBOUND Access closed at all time Detour Exit 137, De Montarville Boulevard, R-132 WEST, Jacques-Cartier Bridge |
| —Majeure (semaine et fin de semaine) | À Brébeuf, chemin du Pont-Prud'homme, sur le pont de la rivière du DiableDirection: Ouest et est | 2026-06-21 23:59 → 2027-08-04 23:59 | Structural repair In Brébeuf, on Du Pont-Prud'homme Road, on the bridge of Du Diable River In both directions Bridge closed, at all times Detour: R-327, R-117, R-323, Carol Road, Le Tour-du-Carré |
| 132Mineure (semaine) | À Sainte-Croix, entre le rang du Petit-Village et la rue BédardDirection: Ouest et est | 2026-11-19 07:00 → 2026-12-03 18:00 | Maintenance In Sainte-Croix, between Rang du Petit-Village and Rue Bédard In both directions Alternating traffic, from Monday to Friday between 7 a.m. and 6 p.m. |
| 212Majeure (semaine et fin de semaine) | À Saint-Augustin-de-Woburn, montée Notre-Dame, sur le ponceau de la rivière ClintonDirection: Ouest et est | 2026-05-19 06:00 → 2026-12-18 18:00 | Construction of a culvert At Saint-Augustin-de-Woburn, Notre-Dame ascent, on the Clinton River culvert In both directions Alternating traffic on reduced lanes, at all times Lanes width reduced to 5 meters |
| 132Mineure (semaine) | À Chateauguay, boulevard Saint-Jean-Baptiste, à la hauteur du boulevard IndustrielDirection: Est | 2026-03-30 05:00 → 2026-12-18 23:59 | Signaling elements In Chateauguay, on Saint-Jean-Baptiste Boulevard, at the intersection with Industrial Boulevard EASTBOUND Right-turn lane closed at all times Detour via R-138 East, R-132 East, A-730 South, A-30 West, exit 41 (Industrial Boulevard) |
| —Mineure (semaine et fin de semaine) | À Stoneham-et-Tewkesbury, chemin de la Grande-Ligne, sur le pont de la rivière HibouDirection: Ouest et est | 2026-05-19 00:00 → 2027-06-01 23:59 | Bridge replacement In Stoneham-et-Tewkesbury, chemin de la Grande-Ligne, on rivière Hibou bridge In both directions Traffic on lnarrowed lanes to 3.8 meters at all times |
| 112Majeure (semaine et fin de semaine) | Entre Montréal et Saint-Lambert, sur le pont VictoriaDirection: Ouest et est | 2026-01-05 05:00 → 2026-12-31 05:00 | Dynamic lane management Between Montreal and Saint-Lambert, on the Victoria Bridge Monday to Friday during peak hours, both lanes are in one direction only: - From 5 a.m. to 9 a.m., towards Montreal (WEST) - From 3 p.m. to 7:15 p.m., towards the South Shore (East) - Outside of th |
| —Majeure (semaine et fin de semaine) | À Notre-Dame-de-Lourdes, rang Saint-Louis, à la hauteur de la R-265Direction: Dans une direction à la fois | 2026-04-13 07:00 → 2026-12-21 18:00 | Bridge repair In Notre-Dame-de-Lourdes, Rang Saint-Louis, at the R-265 In one direction at a time Alternating traffic at all times - Overloaded heavy vehicles prohibited - Right turn onto R-265 prohibited |
| 520Mineure (semaine et fin de semaine) | À Montréal, à la hauteur de l'accès rue HickmoreDirection: Est | 2026-02-28 05:00 → 2026-11-30 23:59 | Reconstruction of the Cavendish Boulevard overpass In Montreal, at the Hickmore Street entrance EASTBOUND Closure of 1 of 2 lanes at all times. |
| 132Majeure (fin de semaine) | À Longueuil, l'accès vers l'A-25 NORDDirection: Ouest | 2026-11-27 22:30 → 2026-11-30 08:00 | Major renovation, Louis-Hippolyte-La Fontaine tunnel In Longueuil, access to Highway 25 North WESTBOUND Access closed at all time Detour R-132 WEST, exit 82, Jacques-Cartier bridge, Notre-Dame street |
| 132Mineure (semaine et fin de semaine) | À Chateauguay, boulevard Saint-Jean-Baptiste, à la hauteur du boulevard IndustrielDirection: Ouest | 2026-05-14 00:00 → 2026-12-18 23:59 | In Chateauguay, Saint-Jean-Baptiste Boulevard, at the Boulevard Industriel WESTBOUND Left-turn lane closed at all times Detour R-138 West, A-30 East, exit 41 (Industrial Boulevard) |
| —Majeure (semaine et fin de semaine) | À Sainte-Marie, route Chassé, sur le pont de la rivière ChasséDirection: Ouest et est | 2026-06-08 00:01 → 2026-12-18 23:59 | Bridge replacement In Sainte-Marie, Route Chassé, on rivière Chassé bridge In both directions Bridge closed at all times Detour: Rang Saint-Gabriel Nord, R-216, R-173 |
| 117Majeure (semaine et fin de semaine) | À Rosemère, au SUD de l'A-640Direction: Sud et nord | 2026-10-04 22:30 → 2026-12-02 05:00 | Public services, aqueduct In Rosemère, SOUTH of Highway 640 In both directions Closure of 1 out of 2 lanes at all times |
| 117Mineure (semaine et fin de semaine) | À Prévost, entre les rues Maple et RicherDirection: Sud | 2026-06-17 07:00 → 2026-12-31 23:59 | Construction of a street, access to the construction site In Prévost, between Maple and Richer Streets SOUTHBOUND Closure of 1 out of 2 lanes at all times |
| 10Majeure (fin de semaine) | À Montréal, entre la rue Wellington et le pont Samuel-De ChamplainDirection: Est | 2026-11-27 22:00 → 2026-11-30 05:00 | Road reconfiguration In Montreal, between Wellington Street and the Samuel-De Champlain Bridge EASTBOUND Highway closed at all times Light vehicle detour: Wellington Street, Gilberte-Dubé Street and Gaétan-Laberge Boulevard. Heavy vehicles: Robert-Bourassa Boulevard, René-Lévesqu |
| 138Mineure (semaine et fin de semaine) | À Boischatel, entre la côte de l'Église et la rivière MontmorencyDirection: Ouest | 2025-05-01 19:00 → 2026-12-31 23:59 | Bridge replacement In Boischatel, between côte de l'Église and Montmorency river WESTBOUND Closure of 1 lane out of 3 at all times |
| 212Majeure (semaine et fin de semaine) | À Saint-Augustin-de-Woburn, sur le chemin du 3e et 4e rang, entre la R-212 et le chemin du Lac-OuestDirection: Ouest et est | 2026-05-19 06:00 → 2026-12-18 18:00 | Construction of a culvert In Saint-Augustin-de-Woburn, on the 3rd and 4th Range Road, between Route 212 and the Lac-Ouest Road In both directions Road closed at all times |
| 136Majeure (semaine et fin de semaine) | À Montréal, dans le tunnel Ville-Marie, entre les boulevards Robert-Bourassa et Saint-LaurentDirection: Est | 2026-03-26 05:00 → 2026-12-31 05:00 | Repair of the overpass on Saint-Urbain Street In Montreal, in the Ville-Marie tunnel, between Robert-Bourassa and Saint-Laurent Boulevards EASTBOUND Closure of 2 out of 4 lanes, at all times |
| 341Majeure (semaine et fin de semaine) | À L'Épiphanie, entre la rue Saint-Germain et le rang de l'Achigan SudDirection: Nord | 2026-04-13 05:30 → 2026-12-01 05:30 | Redevelopment, public services In L'Épiphanie, between Rue Saint-Germain and Rang de l'Achigan Sud NORTHBOUND Road closed at all times Detour Light vehicles: Chemin des Commissaires, R-339 Heavy vehicles: R-339 SOUTH, R-341 SOUTH, A-40 WEST (exit 96-W) or A-40 EAST (exit 122) Lan |
| 116Mineure (semaine) | À Durham-Sud, à la hauteur de la rue de l'ÉgliseDirection: Ouest et est | 2026-11-18 07:00 → 2026-12-04 17:00 | Public utilities In Durham-Sud, at Rue de l'Église In both directions Alternating traffic, from Monday to Friday between 7 a.m. and 5 p.m. |
| —Majeure (semaine et fin de semaine) | À Québec, chemin Sainte-Foy, entre les rues de Rougemont et Isidore-GaronDirection: Ouest et est | 2026-04-17 09:00 → 2026-12-11 23:59 | Construction of a bridge In Quebec, Chemin Sainte-Foy, between rue de Rougemont and rue Isidore-Garon In both directions Road closed at all times Detour: Route de la Suète, Boulevard du Versant-Nord, Avenue du Chanoine-Scott |
| 321Majeure (semaine et fin de semaine) | À Saint-André-Avellin, sur la rue Principale, entre les rues Séguin et LanthierDirection: Sud et nord | 2025-12-16 00:00 → 2027-05-17 23:59 | Bridge replacement In Saint-André-Avellin, on Main Street, between Séguin and Lanthier Streets In both directions road closed at all times Detour via Séguin, Charron and Lanthier streets (temporary bridges). Detours via Routes 317 and 323. Truck detour: A-50, R-323 and 317. |
| 520Majeure (semaine et fin de semaine) | À Montréal, les voies de desserte, à la hauteur du boulevard CavendishDirection: Ouest et est | 2026-03-01 05:00 → 2026-11-30 23:59 | Reconstruction of the Cavendish Boulevard overpass In Montreal, the service roads, at the level of Cavendish Boulevard In both directions Roads closed at all times Detour EASTBOUND: Barr Street, A-520 EAST, Exit 7, Delmeade Road WESTBOUND: Isabey Street, A-40 EAST service road, A |
| 148Mineure (semaine) | À Brownsburg-Chatham, vers l'A-50 OUESTDirection: Est | 2026-11-09 20:00 → 2026-12-04 06:00 | Road maintenance In Brownsburg-Chatham, towards Highway 50 WEST EASTBOUND Access closed - Monday to Thursday between 6:30 p.m. and 6:30 a.m. the following day - Friday between 8 p.m. and 8 a.m. the following day - Sunday between 6 p.m. and 6:30 a.m. Detour: R-148 EAST, R-327 SOUT |
| 520Mineure (semaine et fin de semaine) | À Montréal, l'accès rue HickmoreDirection: Est | 2026-02-28 05:00 → 2026-11-30 23:59 | Reconstruction of the Cavendish Boulevard overpass In Montreal, access via Hickmore Street Heading East Access closed at all times Detour Temporary access to Barr Street |
| 20Majeure (semaine et fin de semaine) | À Notre-Dame-du-Bon-Conseil, sur le pont de la rivière Nicolet Sud-OuestDirection: Ouest et est | 2026-03-10 09:00 → 2027-06-15 23:59 | Structure repair In Notre-Dame-du-Bon-Conseil, on rivière Nicolet Sud-Ouest bridge In both directions Traffic on diverted lanes at all times |
| 265Majeure (semaine et fin de semaine) | À Notre-Dame-de-Lourdes, sur le pont de la rivière BécancourDirection: Dans une direction à la fois | 2026-04-13 07:00 → 2026-12-21 18:00 | Bridge repair In Notre-Dame-de-Lourdes, on rivière Bécancour bridge In one direction at a time Vehicles : Alternating traffic at all times Monday, November 9: Lane width reduced to 3.4 meters at all times At all times: - Lane width reduced to 3.6 meters - Overloaded vehicle prohi |
| 13Mineure (semaine et fin de semaine) | À Montréal, à la hauteur de l'A-520Direction: Sud et nord | 2026-03-30 05:00 → 2026-11-30 05:00 | Reconstruction of the overpass In Montreal, near Highway 520 In both directions Traffic will be diverted and narrowed at all times. Lane width reduced to 3.25 meters each |
| 175Majeure (semaine et fin de semaine) | À Québec, accès à partir du chemin Saint-LouisDirection: Sud | 2026-11-16 05:30 → 2026-12-04 16:00 | Road redevelopment (Boulevard Laurier area) In Quebec City, access from Chemin Saint-Louis SOUTHBOUND Access closed - Monday to Friday between 5:30 a.m. and 4 p.m. - Sunday between 9 p.m. and 5:30 a.m. the next day Detour: Route de l'Église, Boulevard Laurier or Avenue de Liège, |
| —Mineure (semaine et fin de semaine) | À Montréal, sur l'avenue Souligny, entre A-25 et rue Honoré-BeaugrandDirection: Est | 2025-07-04 22:00 → 2026-12-31 05:00 | Renovation of the Louis-H.-La Fontaine tunnel In Montreal, on Souligny Avenue, between A-25 and Honoré-Beaugrand Street Eastbound Closure of 1 out of 3 lanes at all times |
| 19Majeure (semaine et fin de semaine) | Entre Montréal et Laval, sur le pont Papineau-LeblancDirection: Sud et nord | 2026-03-23 04:00 → 2027-04-14 05:00 | Bridge repairs Between Montreal and Laval, on the Papineau-Leblanc bridge Closure of 1 out of 3 lanes at all times |
| 520Mineure (semaine et fin de semaine) | À Montréal, sortie 6 (boulevard Cavendish)Direction: Est | 2026-02-28 05:00 → 2026-11-30 00:00 | Reconstruction of the Cavendish Boulevard overpass In Montreal, exit 6 (Cavendish Boulevard) EASTBOUND Exit closed at all times Detour Exit 7, Delmeade Road, Andover Avenue |
| 20Mineure (semaine et fin de semaine) | Entre le km 112 à Beloeil et le km 114 à Mont-Saint-Hilaire, incluant le pont Arthur-BranchaudDirection: Ouest et est | 2026-08-21 22:00 → 2026-12-31 23:59 | Road reconfiguration Between km 112 in Beloeil and km 114 in Mont-Saint-Hilaire, including the Arthur-Branchaud Bridge Traffic on diverted lanes 2 lanes in each direction EAST: 3.5 meters WEST: 3.4 meters |
| 113Majeure (semaine et fin de semaine) | À Waswanipi, de part et d'autre de la rue PoplarDirection: Sud et nord | 2026-08-10 00:01 → 2027-11-30 23:59 | Pavement repair In Waswanipi, on both sides of Rue Poplar In both directions Alternating traffic at all times Lane width reduced to 3 meters |
| —Mineure (semaine et fin de semaine) | À Saint-Martin, 1er Rang de Shenley Sud, sur le pont de la rivière de la Grande-CoudéeDirection: Sud et nord | 2026-07-13 00:00 → 2026-12-01 23:59 | Construction of a bridge In Saint-Martin, 1er Rang de Shenley Sud, on Rivière Grande-Coudée In both directions Alternating traffic on a diverted road at all times Sharp turn radius |
| 344Mineure (semaine et fin de semaine) | À Grenville-sur-la-Rouge, vers l'A-50 ESTDirection: Ouest et est | 2026-11-09 20:00 → 2026-12-04 06:00 | Road maintenance In Grenville-sur-la-Rouge, towards Highway 50 EAST In both directions Access closed - Monday to Thursday between 6:30 p.m. and 6:30 a.m. the following day - Friday between 8 p.m. and 8 a.m. the following day - Sunday between 6 p.m. and 6 a.m. the following day De |
| —Majeure (semaine et fin de semaine) | À Coaticook, chemin Martin, sur le pont HouleDirection: Est | 2026-09-14 07:00 → 2027-01-14 17:00 | Reconstruction of the bridge In Coaticook, on Martin Road, on the Houle bridge Road closed at all times Detour Houle Road, Cabana Road, Lévesque Road, Martin Road |
| 50Majeure (semaine et fin de semaine) | Entre la R-344 à Grenville-sur-la-Rouge et la R-148 à Brownsburg-ChathamDirection: Ouest et est | 2026-11-09 20:30 → 2026-12-04 06:30 | Road maintenance Between Route 344 in Grenville-sur-la-Rouge and Route 148 in Brownsburg-Chatham In both directions Highway closed - Monday to Thursday between 6:30 p.m. and 6:30 a.m. the following day - Friday between 8:30 p.m. and 8:30 a.m. the following day - Sunday between 6: |
| —Majeure (semaine et fin de semaine) | À Rigaud, chemin du Petit-Brûlé, pont de la rivière à la GraisseDirection: Ouest et est | 2026-09-03 00:01 → 2027-02-26 23:59 | Bridge reconstruction In Rigaud, on the Petit-Brûlé Road, bridge of the river La Graisse In both directions Road closed at all times Detour - Grande Montée Road, County Road 10, Haut-de-la-Chute Road, R-342 - Grande Montée Road, County Road 18, Ribbon Road, R-325 |
| —Majeure (semaine et fin de semaine) | À Laurierville, avenue Provencher, sur le pont de la rivière NoireDirection: Sud et nord | 2026-07-27 00:01 → 2026-12-18 23:59 | Bridge construction In Laurierville, Avenue Provencher , on rivière Noire bridge In both directions Bridge closed at all times Detours: - Light vehicles: 8e Rang Ouest and R-267 - Heavy vehicles: R-116 and R-267 |
| —Majeure (semaine et fin de semaine) | À Ormstown, 3e Rang, entre la montée Rockburn et la R-201Direction: Ouest et est | 2026-08-16 20:00 → 2026-12-18 23:59 | Structural reconstruction In Ormstown, 3rd Range, between Montée Rockburn and R-201 In both directions Road closed at all times. Detour Westbound: Montée Rockburn, Chemin de la Rivière-aux-Outardes, R-138 Eastbound: Montée Rockburn, Chemin William, R-201 |
| 116Mineure (semaine et fin de semaine) | À McMasterville, entre les rues Tétreault et W.-McMasterDirection: Ouest et est | 2026-11-05 09:00 → 2026-12-02 17:00 | Public services In McMasterville, between Tétreault and W.-McMaster Streets WESTBOUND Closure of 1 out of 3 lanes, at all times Local traffic on Sirois, Kennedy and Peter Streets |
| 263Majeure (semaine et fin de semaine) | À Saint-Romain, sur le ponceau du ruisseau RougeDirection: Sud et nord | 2026-06-29 06:00 → 2026-12-07 18:00 | Culvert Reconstruction At Saint-Romain, on the culvert over the Red stream In both directions Alternating traffic on a deviated route at all times From November 11th to Devember 4th Alternating traffic at all times Lane width reduced to 5 meters |
| —Majeure (semaine et fin de semaine) | À Chelsea, entre les chemins Saint-Clément et de la CarrièreDirection: Ouest et est | 2026-08-24 07:00 → 2026-12-16 19:00 | Bridge component repairs In Chelsea, between Saint-Clément and De la Carrière Roads In both directions Road closed at all times Detour R-105 |
| 201Mineure (semaine et fin de semaine) | À Salaberry-de-Valleyfield, boulevard Monseigneur-Langlois, à la hauteur de la rue LégerDirection: Sud | 2026-06-21 00:01 → 2026-12-31 23:59 | Refurbishment of structures In Salaberry-de-Valleyfield, on Monseigneur-Langlois Boulevard, at Léger Street SOUTHBOUND Left-turn lane closed at all times |
| 10Majeure (semaine et fin de semaine) | À Montréal, dans l'accès en provenance du pont Samuel-De Champlain et sur le pont ClémentDirection: Ouest | 2026-03-18 07:00 → 2026-12-18 05:00 | Structural repair In Montreal, in the access road from the Samuel-De Champlain Bridge and on the Clément Bridge WESTBOUND Closure of 1 out of 2 lanes, at all times Track width: 4.5 m |
77 more in the source.
Planned — start date still ahead (120)
| Road · type | Location | Period (source) | Description |
|---|---|---|---|
| 573Mineure (semaine) | À Québec, à la hauteur de l'avenue IndustrielleDirection: Nord | 2026-12-02 09:00 → 2026-12-02 15:00 | Safety features In Quebec, at avenue Industrielle NORTHBOUND Closure of 1 lane out of 5 (right turning lane) |
| 269Mineure (semaine) | À Saint-Gilles, au SUD de la rue du HavreDirection: Sud et nord | 2026-11-30 09:00 → 2026-11-30 13:00 | Drilling In Saint-Gilles, SOUTH of rue du Havre In both directions Alternating traffic |
| —Mineure (semaine) | À Sainte-Félicité, rang Saint-Camille, sur le pont de la rivière Grand CalderDirection: Ouest et est | 2026-11-30 07:00 → 2026-12-04 17:00 | Structural inspection In Sainte-Félicité, Rang Saint-Camille, on rivière Grand Calder bridge In both directions Alternating traffic, Monday to Friday between 7 am and 5 pm |
| —Mineure (semaine) | À Lévis (Saint-Nicolas), rue de Bernières, entre la rue du Sous-Bois et la R-116Direction: Nord | 2026-12-02 08:00 → 2026-12-02 17:00 | Drilling In Lévis (Saint-Nicolas), Rue de Bernières, between Rue du Sous-Bois and R-116 NORTHBOUND Short-term closure of 1 lane out of 2 |
| 136Majeure (fin de semaine) | À Montréal, autoroute Ville-Marie, dans les tunnelsDirection: Est | 2026-11-29 22:30 → 2026-11-30 05:00 | Refurbishment of the overpass on Saint-Urbain Street In Montreal, on the Ville-Marie Expressway, in the tunnels EASTBOUND Highway closed - Friday between 11:30 p.m. and 7 a.m. the following day - Saturday between 11:30 p.m. and 8 a.m. the following day Detour Light vehicle: exit |
| 20Mineure (semaine) | À Lévis (Saint-Nicolas), sortie 311 (R-116)Direction: Ouest | 2026-12-03 21:00 → 2026-12-04 03:00 | Drilling À Lévis (Saint-Nicolas), sortie 311 (R-116) En direction OUEST Traffic on a narrowed lane Lane width reduced to 4.5 meters |
| 15Majeure (fin de semaine) | À Boisbriand, la sortie 20 (A-640, boulevard du Faubourg)Direction: Nord | 2026-11-29 18:00 → 2026-11-30 06:00 | Road reconfiguration In Boisbriand, the exit 20 (A-640, Du Faubourg Boulevard) NORTHBOUND Exit closed Detour Exit 23, Saint-Charles Street, A-15 SOUTH |
| 15Majeure (fin de semaine) | À Blainville, la sortie 25 (boulevard de la Seigneurie)Direction: Nord | 2026-11-29 21:00 → 2026-11-30 06:00 | Road reconfiguration In Blainville, the exit 25 (De la Seigneurie Boulevard) NORTHBOUND Exit closed Detour: Exit 28, Notre-Dame Road, A-15 SOUTH |
| 15Mineure (fin de semaine) | À Blainville, au niveau du boulevard de la SeigneurieDirection: Nord | 2026-11-29 21:00 → 2026-11-30 05:00 | Road reconfiguration In Blainville, at the Boulevard de la Seigneurie NORTHBOUND Closure of 2 out of 4 lanes |
| 973Majeure (semaine) | À Québec, accès à partir du boulevard Wilfrid-HamelDirection: Nord | 2026-11-30 21:00 → 2026-12-01 04:00 | Maintenance In Quebec, access from boulevard Wilfrid-Hamel NORTHBOUND Access closed - Monday and Tuesday between 9 p.m. and 4 a.m. the next day Detour: Avenue du Colisée, Rue Soumande |
| 175Majeure (semaine et fin de semaine) | Entre Québec et Lévis sur le pont de QuébecDirection: Sud et nord | 2026-11-29 21:00 → 2026-11-30 05:30 | Road redevelopment (Boulevard Laurier sector) Between Québec and Lévis, on pont de Québec In both directions Bridge closed - Sunday between 9 p.m. and 5:30 a.m. the next day Detour: pont Pierre-Laporte |
| 20Majeure (fin de semaine) | À Mont-Saint-Hilaire, la sortie 113 (R-133, chemin des Patriotes)Direction: Est | 2026-11-29 22:00 → 2026-11-30 05:30 | Reserved lane development In Mont-Saint-Hilaire, exit 113 (R-133, Des Patriotes Road) EASTBOUND Exit closed Detour Exit 115, Grande-Allée, A-20 WEST |
Show 48 more
| Road · type | Location | Period (source) | Description |
|---|---|---|---|
| 20Majeure (semaine) | Entre la R-255 à Saint-Cyrille-de-Wendover et la R-259 à Notre-Dame-du-Bon-ConseilDirection: Ouest | 2026-11-30 22:00 → 2026-12-01 06:00 | Bridge repair Between R-255 in Saint-Cyrille-de-Wendover and R-259 in Notre-Dame-du-Bon-Conseil WESTBOUND Highway closed, Monday between 10 p.m. and 6 a.m. the next day Detour: R-255, R-122, R-259 |
| 15Majeure (fin de semaine) | À Montréal, autoroute Décarie, entre la rue Jean-Talon et l'échangeurDirection: Nord | 2026-11-29 22:30 → 2026-11-30 05:00 | Securing structures In Montreal, on the Décarie Expressway, between Jean-Talon Street and the interchange NORTHBOUND Highway closed Detour, Décarie Boulevard , Côte-de-Liesse Road Towards A-40 WEST: Sainte-Croix Avenue U-turn |
| 175Mineure (semaine) | Entre Québec et Lévis, sur le pont de QuébecDirection: Sud et nord | 2026-11-30 09:00 → 2026-12-02 15:00 | Maintenance Between Québec and Lévis, on the pont de Québec Closure of 1 lane out of 3, from Monday to Wednesday between 9 a.m. and 3 p.m. |
| 132Majeure (semaine et fin de semaine) | Entre Baie-des-Sables et Saint-Ulric, sur le pont de la rivière TartigouDirection: Ouest et est | 2026-11-30 07:00 → 2026-12-11 18:00 | Bridge repair Between Baie-des-Sables and Saint-Ulric, on the rivière Tartigou bridge In both directions Alternating traffic at all times Lane width reduced to 3.5 meters |
| 15Majeure (fin de semaine) | À Boisbriand, entre le chemin de la Grande-Côte (R-344) et l'A-640Direction: Nord | 2026-11-29 22:00 → 2026-11-30 05:00 | Road reconfiguration In Boisbriand, between the Grande-Côte Road (R-344) and the A-640 NORTHBOUND Closure of 2 out of 3 lanes |
| 368Majeure (semaine) | À Québec, vers la R-138 ESTDirection: Ouest | 2026-12-02 19:00 → 2026-12-04 06:00 | Bridge replacement In Quebec, to R-138 EAST WESTBOUND Access closed - Wednesday and Thursday between 7 p.m. and 6 a.m. the next day Detour: A-440 Dufferin-Montmorency WEST, Boulevard des Chutes |
| 20Mineure (semaine) | À Saint-Roch-des-Aulnaies, à l'OUEST de la route de l'ÉgliseDirection: Ouest | 2026-12-01 09:00 → 2026-12-01 23:59 | Public services In Saint-Roch-des-Aulnaies, WEST of Route de l'Église WESTBOUND If necessary: Closure of 1 lane out of 2 |
| 259Majeure (semaine) | À Notre-Dame-du-Bon-Conseil, vers l'A-20 OUESTDirection: Sud et nord | 2026-11-30 22:00 → 2026-12-01 06:00 | Bridge repair In Notre-Dame-du-Bon-Conseil, to A-20 WEST In both directions Access closed, Monday between 10 p.m. and 6 a.m. the next day Detours: NORTH : A-20 EAST, exit 200 (Saint-Léonard-d'Aston), 13e rang de Wendover, R-122 WEST SOUTH : R-122 WEST, R-255 NORTH |
| 40Majeure (fin de semaine) | À Montréal, autoroute Métropolitaine, entre le boulevard Lacordaire et la rue D'IbervilleDirection: Ouest | 2026-11-29 22:30 → 2026-11-30 05:00 | Structural repair In Montreal, on the Métropolitaine Highway, between Lacordaire Boulevard and D'Iberville Street WESTBOUND Highway closed Detour Exit 76, service road |
| 20Mineure (fin de semaine) | À Beloeil, à la hauteur de la sortie 112 (rue Serge-Pepin)Direction: Ouest et est | 2026-11-29 21:30 → 2026-11-30 05:00 | Reserved lane development In Beloeil, near exit 112 (Serge-Pepin Street) In both directions Closure of 1 out of 2 lanes |
| 350Mineure (semaine) | Entre Saint-Paulin et Charette, sur le pont de la rivière du LoupDirection: Ouest et est | 2026-11-30 07:00 → 2026-12-02 17:00 | Bridge repair Between Saint-Paulin and Charette, on Rivière du Loup bridge In both directions Alternating traffic, from Monday to Wednesday between 7 a.m. and 5 p.m. |
| 153Mineure (semaine) | À Saint-Boniface, entre les rues de la Paix et JacintheDirection: Sud et nord | 2026-11-30 07:00 → 2026-12-08 17:00 | Public services In Saint-Boniface, between Rue de la Paix and Rue Jacinthe In both directions Alternating traffic, from Monday to Friday between 7 a.m. and 5 p.m. |
| —Mineure (semaine) | À Pontiac, chemin Eardley-Masham, entre la R-148 et le chemin LaurierDirection: Ouest et est | 2026-11-30 06:00 → 2026-12-01 18:00 | Slide repair In Pontiac, on Eardley-Masham Road, between Route 148 and Laurier Road Alternating traffic, Monday and Tuesday between 6 a.m. and 6 p.m. |
| 323Mineure (semaine) | À Notre-Dame-de-Bonsecours, entre Côte Ezilda et chemin AzélieDirection: Sud et nord | 2026-12-01 06:00 → 2026-12-02 18:00 | Slide repair In Notre-Dame-de-Bonsecours, between Côte Ezilda and Azélie Road Alternating traffic, Tuesday and Wednesday between 6 a.m. and 6 p.m. |
| 172Majeure (semaine et fin de semaine) | Secteur Mont-Valin, entre le km 66 et le km 67Direction: Ouest et est | 2026-12-01 07:00 → 2026-12-11 18:00 | Drilling Mont-Valin Sector, between Km 66 and Km 67 In both directions Alternating traffic, from Monday to Sunday between 7 a.m. and 6 p.m. |
| —Mineure (semaine) | À Lévis (Saint-Nicolas), chemin Olivier, vers l'A-20 OUESTDirection: Ouest et est | 2026-12-03 21:00 → 2026-12-04 03:00 | Drilling In Lévis (Saint-Nicolas), chemin Olivier, to A-20 WEST In both directions Traffic on narrowed lane to 4.5 meters |
| —Mineure (semaine) | À Saint-François-de-la-Rivière-du-Sud, chemin de Morigeau, sur le pont de la rivière MorigeauDirection: Ouest et est | 2026-11-30 13:00 → 2026-11-30 18:00 | Structural inspection In Saint-François-de-la-Rivière-du-Sud, Chemin Morigeau, on the Rivière Morigeau bridge In both directions Alternating traffic |
| 167Majeure (semaine et fin de semaine) | À Eeyou Istchee Baie-James, sur le pont de la rivière Chalifour, au km 352Direction: Sud et nord | 2026-11-30 08:00 → 2026-12-06 16:00 | Drilling In Eeyou Istchee Baie-James, on rivière Chalifour bridge, at Km 352 In both directions Alternating traffic - From Monday to Sunday between 8 a.m. and 4 p.m. Heavy vehicles prohibited at all times - From Thursday to Sunday between 8 a.m. and 4 p.m. |
| —Mineure (semaine) | À Sainte-Émélie-de-l'Énergie, chemin du Crique-à-David Ouest, à la hauteur du chemin de Saint-DamienDirection: Sud et nord | 2026-11-30 06:00 → 2026-11-30 18:00 | Structural maintenance In Sainte-Émélie-de-l'Énergie, on Crique-à-David Ouest Road, at the intersection with De Saint-Damien Road Alternating traffic |
| —Mineure (semaine) | À Saint-Luc-de-Vincennes, rang Saint-Alexis, sur le pont de la rivière à la FourcheDirection: Ouest et est | 2026-11-30 12:00 → 2026-11-30 14:00 | Structural inspection In Saint-Luc-de-Vincennes, Rang Saint-Alexis, on rivière à La Fourche bridge In both directions Alternating traffic |
| 148Mineure (semaine) | À Pontiac, avant le chemin GibsonDirection: Ouest et est | 2026-11-30 06:00 → 2026-12-01 18:00 | Slide repair In Pontiac, before Gibson Road Alternating traffic, Monday to Tuesday between 6 a.m. and 6 p.m. |
| 204Mineure (semaine) | À Saint-Martin, entre la 7e Rue Est et la 3e Rue EstDirection: Ouest et est | 2026-11-30 09:00 → 2026-12-01 16:00 | Land survey In Saint-Martin, between 7e Rue Est and 3e Rue Est In both directions Alternating traffic, Monday and Tuesday between 9 am and 4 pm |
| 122Mineure (semaine) | À Sainte-Clotilde-de-Horton, à l'EST du 5e RangDirection: Ouest et est | 2026-11-30 09:30 → 2026-12-01 15:00 | Public utilities In Sainte-Clotilde-de-Horton, EAST of 5e Rang In both directions Alternating traffic, Monday and Tuesday between 9:30 a.m. and 3 p.m. |
| 117Mineure (semaine) | À Sainte-Agathe-des-Monts, entre les rues Beaulne et LéonardDirection: Sud | 2026-12-02 07:00 → 2026-12-02 17:00 | Streetlight maintenance In Sainte-Agathe-des-Monts, between Beaulne and Léonard Streets SOUTHBOUND Closure of 1 out of 2 lanes |
| 155Mineure (semaine) | Entre le chemin de la Rive à Shawinigan et la 4e Rue à Saint-Roch-de-MékinacDirection: Sud et nord | 2026-11-30 06:30 → 2026-12-03 17:30 | Public utilities Between Chemin de la Rive in Shawinigan and 4e Rue in Saint-Roch-de-Mékinac In both directions Alternating traffic, from Monday to Thursday between 6:30 a.m. and 5 p.m. |
| —Mineure (semaine) | À La Visitation-de-Yamaska, rang Chatillon, à la hauteur de la rue PrincipaleDirection: Ouest et est | 2026-11-30 07:00 → 2026-11-30 17:00 | Drilling In La Visitation-de-Yamaska, Rang Chatillon road, at Rue Principale In both directions Alternating traffic Lane width reduced to 3.65 meters |
| 212Mineure (semaine) | À La Patrie, de part et d'autre du chemin de LawrenceDirection: Ouest et est | 2026-12-02 07:30 → 2026-12-02 16:00 | Core drilling and drilling In La Patrie, on both sides of Lawrence Road In both directions Alternating traffic |
| 20Mineure (semaine) | À Montmagny, sur le pont de la rivière des PerdrixDirection: Est | 2026-12-03 08:00 → 2026-12-03 16:00 | Structural inspection In Montmagny, on the Rivière des Perdrix bridge EASTBOUND Closure of 1 lane out of 2 |
| 269Mineure (semaine) | À Saint-Martin, à la hauteur de la 4e Rue OuestDirection: Nord | 2026-12-02 12:00 → 2026-12-02 15:00 | Drilling In Saint-Martin, at 4e Rue Ouest NORTHBOUND Traffic diverted Tight right turning radius |
| 50Mineure (fin de semaine) | À Gatineau, entre la R-366 et le boulevard LabrosseDirection: Ouest | 2026-11-29 08:00 → 2026-11-29 19:00 | Marking In Gatineau, between Route 366 and Labrosse Boulevard WESTBOUND Closure of 1 out of 2 lanes |
| 55Mineure (semaine) | À Shawinigan, à la hauteur du chemin de la Valée-du-ParcDirection: Sud | 2026-12-02 20:30 → 2026-12-03 06:00 | Maintenance In Shawinigan, at Chemin de la Vallée-du-Parc SOUTHBOUND Closure of 1 lane out of 2, Wednesday between 8:30 p.m. and 6:00 a.m. the next day Lane width reduced to 4 meters |
| 344Mineure (semaine) | À Grenville, entre les rues Principale et WadeDirection: Ouest et est | 2026-12-01 06:00 → 2026-12-02 15:00 | Sump maintenance In Grenville, between Principale and Wade Streets Alternating traffic, Tuesday and Wednesday between 6 a.m. and 3 p.m. |
| 245Mineure (semaine) | À Bolton-Est, route Missisquoi, au SUD de la route Nicholas-AustinDirection: Sud et nord | 2026-11-30 07:00 → 2026-12-01 18:00 | Drilling In Bolton-East, on Missisquoi Road, south of Nicholas-Austin Road In both directions Alternating traffic -Monday and Tuesday between 7 a.m. and 6 p.m. |
| 138Majeure (semaine) | À Cap-Santé, entre la rue des Aulnes et le Vieux CheminDirection: Ouest et est | 2026-11-30 00:01 → 2026-12-04 17:00 | Drilling In Cap-Santé, between rue des Aulnes and Vieux Chemin In both directions Road closed at all times Detour: Rue Provencher, A-40, R-358 |
| 20Mineure (semaine) | À Montmagny, sur le pont de la rivière des PerdrixDirection: Ouest | 2026-12-02 08:00 → 2026-12-02 16:00 | Structural inspection In Montmagny, on the Rivière des Perdrix bridge WESTBOUND Closure of 1 lane out of 2 |
| 116Mineure (semaine) | À Warwick, à l'EST de la rue Saint-LouisDirection: Est | 2026-12-01 08:30 → 2026-12-01 15:00 | Public services In Warwick, EAST of rue Saint-Louis In both directions Closure of 1 lane out of 2 |
| 55Mineure (semaine) | À Trois-Rivières, à la hauteur du boulevard des ForgesDirection: Sud et nord | 2026-12-01 20:30 → 2026-12-02 06:00 | Maintenance In Trois-Rivières, at Boulevard des Forges In both directions Closure of 1 lane out of 2, Tuesday between 8:30 p.m. and 6:00 a.m. the next day Lanes width reduced to 4 meters |
| 55Mineure (semaine) | À Saint-Célestin, au NORD de la R-226Direction: Sud | 2026-11-30 08:30 → 2026-12-03 15:00 | Public utilities In Saint-Célestin, NORTH of R-226 SOUTHBOUND Closure of 1 lane out of 2, Monday to Thursday between 8:30 am and 3 pm |
| —Mineure (semaine et fin de semaine) | À Gaspé, boulevard de York Ouest, à la hauteur de la rue de Sunny BankDirection: Ouest et est | 2026-11-30 07:00 → 2026-12-11 18:00 | Drilling In Gaspé, boulevard de York Ouest, at rue de Sunny Bank In both directions Alternating traffic, Monday to Sunday between 7 am and 6 pm |
| 132Mineure (semaine) | Entre le km 1462 à Saint-André-de-Restigouche et le km 1475, secteur RouthiervilleDirection: Ouest et est | 2026-11-30 07:00 → 2026-12-10 16:00 | Maintenance Between km 1462 in Saint-André-de-Restigouche and km 1475, Routhierville sector In both directions Alternating traffic, from Monday to Thursday between 7 a.m. and 4 p.m. |
| 20Mineure (semaine) | À Cap-Saint-Ignace, à la hauteur de la route du Petit-CapDirection: Ouest et est | 2026-12-01 08:00 → 2026-12-01 16:00 | Structural inspection In Cap-Saint-Ignace, at Route du Petit-Cap In both directions Closure of 1 lane out of 2 |
| —Mineure (semaine) | À La Visitation-de-Yamaska, rang Saint-Pierre, à la hauteur de la R-226Direction: Ouest et est | 2026-12-02 07:00 → 2026-12-17 17:00 | Drilling In La Visitation-de-Yamaska, Rang Saint-Pierre road, at R-226 In both directions Alternating traffic, from Monday to Friday between 7 a.m. and 5 p.m. Lane width reduced to 3.65 meters |
| —Mineure (semaine) | À Beauceville, route du Golf, à la hauteur du rang Saint-GaspardDirection: Ouest | 2026-12-02 08:00 → 2026-12-02 12:00 | Drilling In Beauceville, route du Golf, at rang Saint-Gaspard WESTBOUND Traffic diverted Tight right turning radius from rang Saint-Gaspard |
| 55Majeure (semaine) | À Shawinigan, accès à partir du chemin de la Valée-du-ParcDirection: Sud | 2026-12-02 20:30 → 2026-12-03 06:00 | Maintenance In Shawinigan, access from Chemin de la Vallée-du-Parc SOUTHBOUND Access closed, Wednesday between 8:30 p.m. and 6:00 a.m. the next day Detour: A-55 NORTH, sortie 223 (Avenue de Grand-Mère), 26e Rue, 5e Avenue, 25e Avenue, 6e Avenue, Avenue du Bocage, A-55 SOUTH |
| 20Mineure (semaine) | Entre le km 448 à Rivière-Ouelle et le km 451 à Saint-PacômeDirection: Ouest et est | 2026-12-01 00:00 → 2026-12-01 23:59 | Bridge repair Between km 448 in Rivière-Ouelle and km 451 in Saint-Pacôme In both directions Closures of 1 lane out of 2 |
| 20Mineure (semaine) | À Lévis (Saint-Nicolas), entre l'A-73 et la R-171Direction: Ouest | 2026-12-03 21:00 → 2026-12-04 03:00 | Drilling In Lévis (Saint-Nicolas), between A-73 and R-171 WESTBOUND Depending on the progress of the work: - Closure of 1 lane out of 2 or 3 - Closure of 2 lanes out of 3 |
| 117Mineure (semaine) | À Saint-Jérôme, entre les rues des Chutes-Wilson et BélisleDirection: Sud et nord | 2026-11-30 09:00 → 2026-12-02 15:00 | Streetlight maintenance In Saint-Jérôme, between Chutes-Wilson and Bélisle Streets In both directions Closure of 1 out of 2 lanes and U-turns, Monday to Wednesday between 9 a.m. and 3 p.m. |
| 55Majeure (semaine) | À Trois-Rivières, vers l'A-40 ESTDirection: Nord | 2026-12-03 20:30 → 2026-12-04 06:00 | Maintenance In Trois-Rivières, towards A-40 EAST NORTHBOUND Access closed, Thursday between 8:30 p.m. and 6:00 a.m. the next day Detour: A-55 NORTH, exit 183, Boulevard Jean-XXIII, Boulevard Saint-Jean, A-55 SOUTH, exit 183 (Boulevard Jean-XXIII) |
60 more in the source.
MTMD · Données Québec, Creative Commons CC BY 4.0 · For closures and detours right now, use Québec 511
The MTMD publishes roadworks and winter road-surface datasets under CC BY 4.0. Data are fetched only on this page and never treated as complete live road clearance.
Select a dataset and load it from the Québec government service.
MTMD · Données Québec CC BY 4.0 · Winter conditions metadata
Winter reports update on an agency schedule, typically from 15 October to 15 April, not minute by minute. Fields not recognised or service timeouts are marked unavailable.